A Flood Risk Assessment is required under the National Planning Policy Framework (NPPF) and the Environment Agency (EA) guidance on development and flood risk when a development is located in Flood Zone 2 or 3, a Critical Drainage Area, or the site is greater than or equal to 1 hectare in size, for sites in Flood Zone 1.
You’ll also need a Flood Risk Assessment if your development is taking place within 20 meters of an Environment Agency main river. Environment Agency activity permits will be required if the proposal includes temporary and permeant works within 8m of a EA river and 16m of a tidal EA river.